![]() Staff will remain at Alert Condition One until SCP-076-2 is confirmed neutralized. In the event of a full breach, all on-site staff are to proceed immediately to the closest security station for weapons and armor distribution. Armament is to include, but not be limited to, at least one (1) ███████ CIW system on a pintle mount with a clear line of sight down the corridor, with a plexiglass screen to protect the operator from thrown weapons. The walls and floor of the corridor are to be reinforced in a similar manner to the PCZ, with the addition of an electric deterrence system capable of delivering a 20,000 volt shock.Ī security station located at the entrance to the killing corridor is to be staffed with no fewer than three (3) armed security personnel on watch at any one point in time. ![]() A 150 m "killing corridor" which is to be the sole access to the PCZ from the ASA (including water, power, drainage, and ventilation lines).PCZ is to be designed to be flooded and drained as needed, and should remain filled with seawater unless access to contents is required. A Primary Containment Zone (PCZ), consisting of a 7 m cube encased in 1.5 m of reinforced material.An Administrative and Support Area (ASA) consisting of support facilities and living quarters for on-site personnel.An Outer Security Perimeter against outside threats, staffed by security personnel trained in close quarters battle and counter-intrusion tactics.Elevator shaft shall be flooded with seawater when not in use.Ĭontainment Area 25b is to be constructed with the following components: Sole access to the containment facility is to be through a vertical elevator shaft separated every fifty (50) meters with a reinforced blast door, constructed of 20 cm thick material shielding. Containment Area 25b is to be located 200 m below sea level, tunneled out of solid bedrock in a seismologically stable area.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |